Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 39 years, born on 1 January 1986
Astrakhan, willing to relocate (Almaty, Astana, Baku, Bishkek, Vladivostok, Voronezh, Other regions, Yekaterinburg, Kazan, Kyiv, Krasnodar, Minsk, Moscow, Nizhny Novgorod, Novosibirsk, Perm, Rostov-na-Donu, Samara, Saint Petersburg, Saratov, Sochi, Stavropol, Tashkent, Tbilisi, Tyumen, Ufa, Chelyabinsk, Yaroslavl), prepared for business trips
The approximate area of the job search is specified
Senior Field Specialist
6 500 $ in hand
Specializations:
- Other
Employment: full time
Work schedule: full day
Work experience 13 years 1 month
August 2014 — currently
10 years 9 months
Senior Field Specialist
Completions Segment - Reservoir Monitoring and Control Senior Field Specialist (G10)
Performed 42 successful well completion jobs (including DTS Wet-Met, Subsea and Dry Tree
Single/Double Multizone Down Whole Permanent Temperature and Pressure Gauge and Fiber
Deployment installations, Data Acquisition and Management projects, and Troubleshooting) .
Completed Reservoir Monitoring and Control (RMC) Basic, Subsea Installation, and Fiber Optic
Distributed Temperature Sensor Schools, and accomplished advance level competencies. Initiated
Continues Improvement projects and completed. Created 6 Standard Work Instructions.
Now continue with:
Supervision completion jobs in Baku Azerbaijan, Russia and Saudi Arabia. Assist Project Manager
and Project Engineers in planning, procedure writing and manual preparations. Prepare
presentations for client meetings, participate and present. Participate in PEER reviews and After
Action Reviews.
April 2014 — August 2014
5 months
Aztexika Ltd
Inventory Controller
After Sale Department Inventory Controller
Investigated inventory level control system and established min/max points according to turnover,
manufacture supply levels, lead time and delivery statistics. Managed inventory level to satisfy
service goals. Conducted frequent studies physical inventory to verify accuracy of computer
records and provided necessary reports for inventory adjustments between physical and computer
records. Administered ERP system, performed quality control audits for incoming and outgoing
shipments.
October 2013 — April 2014
7 months
Azerenerji JSC
Engineering Analyst
Investment and Strategic Development Department
Project Appraisal & Analysis Division
Gained strong qualifications on official documentations, participating in the negotiations and
preparing presentation. As an engineer participated in the Projects Initiation, RFP preparation,
Planning, Monitoring and Closing phases. Gained project engineer experience by working with
professional engineers of local companies and foreign companies such as Siemens, TEPSCO, GE in
different stages of the projects. Participated in the projects: Advanced Metering Infrastructure
Implementation, Feasibility Study - Gas Combined Cycle Power Plant, Commissioning of Modular
Power Plants and Reconstruction of Substation.
April 2012 — November 2013
1 year 8 months
Aquavita TAJ LLC
Assistant
Operations Department Assistant of the Technical
Development Director
Participated in Project Reviews, with Contractors, Company Leadership & Internal Project Staff.
Participated in new projects study works. Demonstrated technical correspondence with equipment
and processes suppliers. Planned, scheduled and controlled: maintenance works and safety
procedures; electrical diagrams and P&ID: designing, checking the drawings, classification
equipment, numbering and positioning; classification of technical documents, operation and service
manuals, instructions and drawings in the technical library. Coordinated subordinate departments
(electrical, mechanical, processing, purchasing etc.) activities. Changed and designed new Operation
Departments reporting formats according to ISO 22000:2005 requirements. Launched reporting
data systematization program. Forecasted and prepared Production Plan. Accounted and controlled
power and row material consumption, subordinate staff working hours, and report to management.
Developed calculation and control tools for managing to simplify and speed up decision taking time.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category B, CAbout me
Troubleshooting, Completed Reservoir Monitoring, RFP preparation, Gained project engineer experience, Managed inventory, Metering Infrastructure Implementation, Quality Control, Audit, Feasibility Studies, Substations, P&ID, Business Communication Management, Financial Accounting, Financial Forecasting, Logistics, Operations Management, Power Generation, Problem Solving, Project Analysis, Project Coordination, Project Management, Reservoir Monitoring, Team Management, Fibre Optics > Fibre Optic Cable, Siemens Hardware, Autocad, C++, Corel Draw Suite, Microsoft Excel, Microsoft PowerPoint, Microsoft Project
Higher education
2021
Heriot Watt
MSc Petroleum Engineering , Petroleum Engineering
2019
Khazar University
Economic , MBA in Project Managment
2013
Azerbaijan State Oil Academy
Bachelor of Engineering
Languages
Citizenship, travel time to work
Citizenship: Azerbaijan
Permission to work: Azerbaijan, Russia
Desired travel time to work: Doesn't matter