Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online yesterday at 23:48

Candidate

Male, 63 years, born on 19 September 1961

Considers offers

Voronezh, not willing to relocate, prepared for business trips

Construction projects manager, Construction Director, Senior Civil Engineer

Specializations:
  • Chief project engineer
  • Design engineer
  • Foreman, construction and installation manager
  • Project manager
  • Construction project manager

Employment: full time

Work schedule: full day

Work experience 41 year 1 month

September 2024currently
8 months
ПАО Ил ВАСО
Leading construction specialist
Management of construction projects.
September 2023August 2024
1 year
Supporting Systems ltd

Novosibirsk, spacestructure.ru

Construction, Real Estate, Architecture... Show more

Structural Design engineer, fixed term contract
Calculation of mesh structures of building shells of arbitrary and bespoke geometry.
April 2023August 2023
5 months
ООО "Глобальные напитки"

Voronezh

Food Products... Show more

Deputy General Director, fixed-term contract
Identification of the reasons for the chronic backlog in the implementation of the soft drinks plant project (40000m2), getting methods determinated to eliminate the existing backlog. Sorting out problems to eliminate the backlog of general construction works. So the result of my management is getting the general construction works having been carried out within the terms stipulated by the project schedule.
June 2022October 2022
5 months
ООО Новапласт , Voronezh

Voronezh

Construction director,fixed-term contract.
Management of Yaman SPA Resort construction project implementation. Yaman SPA Resort is a multifunctional tourist and entertainment center by river Don in Voronezh Region, The project has been postponed due to the land registration need.
October 2021March 2022
6 months
ООО Стимул+

Novomoskovsk (Tula Oblast)

Construction, Real Estate, Architecture... Show more

Project manager, fixed term contract
Project Management of a new P&G Distrubuter Center with LIPD (Lean integrated project delivery) tools. The project has been stopped by P&G due to sanctions implemented to Russian Federation.
October 2019September 2021
2 years
Abbott (Veropharm) Belgorod

Belgorod

Medicine, Pharmaceuticals, Pharmacies... Show more

Project Manager, Fixed-term contract
Management of brownfield pharmaceutical projects implementation. Taking part in initiating a project, leadership of planning,executing,monitoring and controlling and closing the projects.Construction companies qualification assessments, tender procedures followed by a general contractor definition. Concluding the projects contracts,holding the projects meetings, initial permits preparation, working out the design assignments, control of designing and construction, expertise of a project design,getting the permits for construction, check and preparation of as-built documentation, check of KC2, KC3 acts,controlling scope, budget,schedule, quality,resources and risks of the projects. Getting conclusion on conformity (ЗОС) and launch into operation permit from local authorities. There have been canteen, changing rooms and floor slabs refurbishment projects implemented successfully in terms of active pharmaceutical factory. The projects of Analytical laboratory and Manufacture, Science and Technology Centre were in completion phase.
August 2018September 2019
1 year 2 months
PharmaGroup

pharmagroup.ru/

Construction, Real Estate, Architecture... Show more

Project construction site manager, fixed term contract.
Bionorica Pharmaceuticals factory engineering systems project implementation. The factory site management of 24 systems installation, scheduling, WD correction, the systems testings, launch into operation, as-built documentation, hand over procedures.
September 2017August 2018
1 year
HOG SLAT RUS

Russia, www.hogslat.ru/

Industrial Equipment, Machine Tools and Components... Show more

Project Management Director, fixed-term contract.
Agriculture projects management. Implementation of the projects,handing over the accomplished projects to a customer, preparing as-builts, the projects commisionings according to contracts schedules and dead lines. Setting up the full cycle of a project implementation: Initial data,design,construction and equipment installation, start up, launch into operation. A project budget optimization,introduction of the general principles of PMBoK. So 7 WTF farms of 40000 hogs a year each have been successfully launched into operation.
April 2016August 2017
1 year 5 months
Reneisans Construction

Saint Petersburg, www.rencons.com,http://lakhta.center/ru/article/?id=1151

Construction, Real Estate, Architecture... Show more

Facade systems Chief Engineer, fixed term contract.
Facade systems project chief engineer at Lahta-centre -Managing and solving critical designing issues and getting customers approval for the design solutions and documentation -Managing the project facade systems tests - working out design ,method statements, the tests performance and reports and getting them approved by the customer - Working out layouts and method statements of the facades installation and getting the customer's approvals - participation in quantity and quality control of facade structures being delivered on site - Management of installation works - responsible for as built documentation of the facades works executed - hand over procedures -overheads optimization of the project The unique innovative facades working designs and drawings of intricate geometric and curvilinear forms (cable-stayed, spider, structural glazing, modular facades, ETFE membrane facades) have been carried out and approved. The sophisticated Method statements accomplished for the unique installation processes of facade works, resulting in the magnificent architectural landmark of St. Petersburg - Lakhta-Center.
July 2014April 2016
1 year 10 months
Supporting Systems ltd

Novosibirsk, spacestructure.ru

Construction, Real Estate, Architecture... Show more

Project Manager, fixed-term contract.
Management of a conceptual and bespoke architecture projects. - Working architectural concepts out and getting approval by a customer - Woking out a project schedule to be approved by the customer - Managing a design work and getting customers approval for the design documentation - Control of supply schedules - Working out layouts and method statements of structures installation and getting approvals of general contractor and the customer - Quantity and quality control of structures being delivered on site - Management and quality control of installation works - Preparing and submitting as built documentation of the works executed - Optimization of overheads of the project. Management of erecting curvilinear roof structure on administrative building Angstrem in Maslowsky industrial park, Voronezh. Working on the concepts of Sheremetyevo airport roof structure and new Simferopol airport facade structure. The author of the architectural and structural concept of Angstrem administrative building curved roof which is successfully done.
November 2011June 2014
2 years 8 months
Angstrem Management Company LLC

Voronezh, angstrem-mebel.ru/about/

Timber Industry... Show more

Construction Director
- Leadership of a new factory project and setting up the project team - creation of the project technological, architectural and construction concepts - working out the project schedule and budget - getting state permits and initial documents for the project design start up - qualification assessment and selection of design companies combined with contest of preliminary designs for tender - carrying out the tender procedure of the design companies qualified - contracting with the design company defined by the tender procedure - management of the design process, combined with finance control, stage by stage inspection of the design documentation being worked out - getting state expertise approval and permit for construction start up - qualification assessment and selection of construction companies according to criteriums defined by the project team - carrying out a tender procedure followed by project team definition of a general contractor - contracting with the general contractor defined on terms of the project schedule, scope, local legislation etc. - management of the project construction - preparing as built documentation for a creditor bank and state architectural and construction control Production and Logistics Complex ANGSTREM (80000m2) project management (following PMBoK standard) from concept through developing schedule, budget determination , all designing works, state expertise and permits, tender procedures and construction to the first phase (27000m2) implementation. 1 phase of PLC ANGSTREM is a big store in Voronezh Industrial Park "Maslowski with big span curvilinear roof structure(950tn), - the author of the architectural and structural concept.
August 2004October 2011
7 years 3 months
Mars LLC

Food Products... Show more

Senior Civil Engineer
- Working a project scope out from an objective; - creation of the project architectural and construction concept according to the project scope; - working out the project schedule and budgeting; - getting state permits and initial documents for the project design start up; - qualification assessment and selection of design companies in accordance of criteriums approved by the Project Team; - carrying out a tender of the design companies qualified; - contracting with the design company defined by the tender procedure; - management of the design works, combined with finance control, stage by stage inspection of the design documentation being worked out; - getting state expertise approval and permit for construction start up; - qualification assessment and selection of construction companies for tender according to the criteriums defined by the Project Team; - arranging tender procedure followed by collegial definition of a general contractor; - contracting with the general contractor on terms of the project schedule, scope, local legislation etc; - management of the project construction, following up the project schedule, making sure in date of commissioning; - preparing as built documentation for state architectural and construction control; - participating in internal commissioning procedure, getting commissioning permits from state controls; - LEED certification implementation in green field and brown field projects; - maintaining an effective communication with relevant functions in Project Team, Commercial/Procurement Department, Financial Department, Management Team and other applicable. The projects implementation Office-bridge(3000m2) of Mars pet care in Luzhniki – author of structural scheme, my participation - from idea to finish of steel erection. Novosibirsk Mars pet care office(3000m2) including microbiology Laboratory with parabolic hyperboloid roof structure - author of architectural concept, my participation - from idea to commissioning. Pet care Pilot plant with microbiology Laboratory in Luzhniki(3000m2), my participation - from idea to commissioning Luzhniki pet care factory(7200m2,22,5ktn/year), with methyl methacrylate flooring, my participation - from plan to launching into operation. Pet food factory in Ulyanovsk(32000m2, 45ktn/year) with methyl methacrylate flooring, my participation - from a site selection to the factory commissioning. Pet food factory in Novosibirsk ( 3500m2, 18ktn/year) with Wastewater Treatment Plant(1500m3/day) and 9км pressure sewer, my participation - from plan to commissioning.
August 2003August 2004
1 year 1 month
Gallery Chizhova Association

Hotels, Restaurants, Food Service Industry, Catering... Show more

Construction project manager,fixed term contract.
Leadership of the biggest shopping center Rossiya development in Voronezh, monitoring suppliers, carrying out tender procedures, controlling the project commercial aspects optimization, providing the project profitability.
January 2003August 2003
8 months
Melkane Manufacturing LTD.

Ireland

Construction, Real Estate, Architecture... Show more

Senior Engineer,fixed term contract.
Setting out and installing Alucobond rain screen panels on Mespill Road Bank of Ireland construction in Dublin, main contractor - John Sisk & Sons Supervising, surveying, setting out , erecting curtain wall arch shaped screen of RAICO system, main entrance curtain walling, bespoke balconies polygon shaped screen, erecting scaffold ,supporting steelwork on 5-stars ARTHOTEL in Voronezh.
September 2002January 2003
5 months
Midland Steel Erection LTD

Ireland

Site Engineer,fixed term contract.
Setting out, surveying, erecting steel structures on Agricultural Laboratories Site nearby Celbridge, Co. Kildare,main contractor - Bennett.
March 2000September 2002
2 years 7 months
PORTAL GLAZED STRUCTURES LTD

Great Britain, portal-ltd.com

Construction, Real Estate, Architecture... Show more

Senior engineer
I was working at Leopards Town Block E in Dublin. It is the main entrance consists of Pilkinton planar screen of 40 meters high together with sloped roof light and another roof light and curtain walling on the top of the same building. My tasks and responsibilities included surveying, setting out steel structures, curtain walling, glazed structures, etc. I was controlling installation progress, coordinating our working drawings with other subcontractors, supervising Russian fixers, translating etc.Next job was glazed bridge on Fleet st. (Shoe Lane), London. Pilkinton planar system was installed by our team in very short time. After that a very fascinating roof light was done at One Bunhill Row in London as well.After I was working in Scotland. A huge sloped roof light - Curtal roof glazing system - was used at biggest shopping center in East Kilbride. I was doing the same job - surveying, setting out, supervising etc.Then I was involved in two jobs in Leeds. It was "The Light" - big mall roof at Radisson SAS Hotel and Leeds City Station - setting out, glazing, fixing flashings, castings etc.
October 1997March 2000
2 years 6 months
SASHDAWN LIMITED

Great Britain

Construction, Real Estate, Architecture... Show more

Site Manager
I commenced working for Sashdawn Ltd at the Partya Corporation's Domino outlet in Moscow, we were installing Pilkinton Planar glass wall system and my responsibilities were supervising our labor force, translating, setting out, surveying etc. We were fixing brackets, carriers using scaffold and cherry pickers, then securing fins, glass units. Working together with many subcontractors made us do our job in strict accordance with schedules and programs. It was winter time and we had to be very quick to complete the contract. Then I was passing a training course in London on Taylor Woodrow Test Rig. We were erecting and testing curtain walling and rain- screen cladding fragments for the New British Embassy in Moscow. The New British Embassy is a big complex consists of three apartment blocks, offices East, Chancery, Swimming pool, Tennis court, Amenities, Squash yard etc. Many different types of cladding, curtain walling, windows, doors, beam and column casings, soffits have been fixed by us. A lot of subcontractors were working together with us and it was necessary to coordinate our schedules with them to follow programs up and make sure in date completion. Many times I had to coordinate our drawings with the subcontractors in order to facilitate our performing together and providing progress. I was installing the different Schuco, Reynolds glazed and rain screen systems on this interesting complex. Being in charge of setting out, organizing and training our labour from set-out to completion gave me a great experience
January 1994October 1997
3 years 10 months
FIRM STROYSERVICE LTD.

Voronezh

Deputy Director
Supervised construction had been carried by the firm, had been responsible for trade and cooperation with European manufacturers of finishing materials and equipment - n.v. BAUWENS GASTON (Belgium), Pamesa, Adincra, Roca (Spain), S-75 (Italy), Jitona (Czech rep.) etc. Then trained our labor force and applied these materials and equipment in housing and office contracts
July 1991January 1994
2 years 7 months
ENERGOSTROITEL ASSOCIATION

Voronezh

Construction, Real Estate, Architecture... Show more

Head of marketing, foreign trade and construction department
Supervised manufacturing structural elements of concrete, wood and steel, assembling them, mostly for wooden and brick cottages of 1 to 3 floors. My role as a manager included time scale, cost and programs. Initially setting up trade and cooperation with German and other foreign firms, organize production and delivery of construction building and finishing materials for housing and office contracts. Then construction and installation of this equipment in Voronezh and Germany. Selling structural elements of wood to German firm "Wilhelm Behrmann and Sohn", Hamburg.
September 1983July 1991
7 years 11 months
"UGOVOSTOKATOMENERGOSTROI" TREST

Voronezh

Construction, Real Estate, Architecture... Show more

Foreman, Senior Foreman
I worked at Voronezh Nuclear Power Station started from excavation, foundation and concrete shell. This was a combination of monolithic, prefabricated and steel structures up to the top level. It was a huge complex included chemical water treatment, reactor compartment, special water treatment, administrative building, the steam generator compartment etc. My company was the general contractor and my role as a foreman was to provide progress on the site together with other supervisors and managers, to make programs, follow them up, to make sure in date completion. In addition that was an interesting job especially working together with many subcontractors which were creating miracle installing services and I have had a great experience. I was involved in construction of Balakovskaya Nuclear Power Station, Thermal Power Stations in Lipetsk, Voronezh, Tambov and other energy facilities

Skills

Skill proficiency levels
Construction
Construction Law
Construction Management
Civil Engineering
Project management
Steel structures
Rainforced concreat
Cladding
Curtain wall
Building Materials
Flooring
Contract Management
Fluent English
Business English
Negotiation skills
Driving Licence B
Presentation skills
Analytical skills
PMBOK
Team management
Project Planning
Quality Control
MS Project
AutoCAD
MS Office
Lean
SCAD
Lean IPD
Autodesk Revit
Lira

Driving experience

Own car

Driver's license category B

About me

39 years of multifunctional experience in construction includes project management,budgeting,conceptual architecture, civil engineering,supporting structures,site management,engineering systems, architechtural and structural design, various facade and glazing systems, quantity serveying, serveying, tender procedures,local state permits and regulations etc The most interesting of the portfolio: glazed main entrance of the building Vodafone Leopards Town in Dublin, a glass bridge next to Fleet st. (walkway above Shoe Lane) in London, the new building of the British Embassy in Moscow, the petfood factory in Novosibirsk (Mars petcare), Mars petcare factory in Luzhniki Moscow region, bridge office of Mars petcare factory in Luzhniki - author of the structure scheme, Mars petcare office in Novosibirsk with a parabolic hyperboloid roof structure - author of the architectural concept. 1 stage of PLC ANGSTREM Voronezh Industrial Park "Maslowski" with big span curvilinear roof structure, - the author of the architectural and structural concept. Since 1983 I have been working in construction, started my career in trest YugovostokAtomenergostroy, was directly involved in the construction of Voronezh nuclear district heating plant as a foreman of the general contractor, Balakovo NPP, Lipetsk thermal power station-2, Voronezh CHP and other energy facilities. Hobbies: Hang Gliding, Speed riding, Speed flying, skiing, conceptual architecture, English, fitness, music, football, aquarium. civil engineering,

Portfolio

Higher education

1993
Faculty of Romance and Germanic Philology, Philologist, Intepreter. Higher education diploma.
1983
Faculty of Industrial and Civil Engineering, Construction Engineering, higher education diploma.

Languages

RussianNative


EnglishC2 — Proficiency


Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter