Work experience 15 years 6 months
May 2021 — currently
4 years
Novaport-TSUS
Voronezh, novaport.ru
Electrical and communications engineer
Electrical and communications engineer/
Control of the building and installation works by contractors in accordance with the contract documents, design and elaborated on its basis working documentation, construction norms and rules and other regulatory documents for the infrastructure facilities of the Project.
Participation in the organization and control of the production of construction and installation works, including installation of equipment, in accordance with the contract documents, design and developed on the basis of its working documentation, building codes and regulations and other regulatory documents.
Analysis of the contractual, design, working and other technical documentation to determine compliance of the scope and timing of work in the schedules and timetables developed by the general contractor under the Project.
Control compliance of the scope of works and deadlines specified in the schedule and schedules developed by the general contractor with the contractual, design, working and other technical documentation.
Participate in the identification and confirmation of the necessity to perform additional work not included in the design and work documentation within the scope of its competence.
Participation in the distribution and approval of changes in design solutions arising in the course of construction.
Evaluating the composition and scope of construction work to be performed when coordinating the schedule for the development of capital investments.
Assessment of the composition and scope of construction work to be performed when approving the commissioning plan for the infrastructure facilities.
Participation in control of compliance of the composition and scope of construction works stated by the general contractor in the acts of performed works and logbook of performed works with the actual execution.
Participate in the control of general work register, logbook KÑ-6a, and other special work registers stipulated by the regulatory documents regulating the execution documents at capital construction facilities.
Participation in production meetings, with the participation of representatives of the general contractor, design institute of the author's supervision, aimed at the identification and prompt resolution of issues affecting the terms of implementation of project stages.
Preparation of information and proposals related to construction.
Control over the process of the Contractor's performance of the necessary works, registration of the Project Infrastructure Object construction completion and preparation by the General Contractor of the necessary set of documents for obtaining an occupancy permit.
Study of the causes of delays and deterioration in the quality of construction and erection works, taking measures to prevent and eliminate them.
Monthly control over the formation of the executive technical documentation for the work performed.
Control over cumulative accounting, formation of a complete set of the executive technical documentation for the completed construction facilities in accordance with the approved list of the executive technical documentation.
Participate in verification of compliance of actually performed works with the design and working documentation, in commission inspections of the construction with supervisory authorities, in work on commissioning of completed facilities, in negotiations, meetings, working groups together with representatives of interested services, contractors, other enterprises and organizations on issues within the competence.
Participation in solving technical issues arising in the process of construction and commissioning of infrastructure facilities, with the involvement of competent departments and services, design organizations, contractors and subcontractors.
Accounting for completed construction and installation work and preparation of necessary data for reporting on the implementation of capital construction plans.
November 2020 — May 2021
7 months
Russian representative office Gerico France
Engineer
Management of a complex of electrical work (EMR) at the facility of "Tanais Plant for the production of field crops", by project sections: electric lighting, 0.4 kV electric power, power supply 10 kV and more, automation of technological processes, fire alarm, communication systems, systems remote access control, data transmission systems.
Operational control of production processes during construction and installation and electrical work.
Participation in the preparation of schedules for the production of electrical work and commissioning. Monitoring compliance with the schedules for the production of electrical work and commissioning. Participation in the inspection control of the production of electrical work and commissioning.
Interaction with representatives of contractors, subcontractors, necessary for the timely and high-quality completion of work. Personnel management of contractors and subcontractors during electrical installation work and commissioning.
Interaction with representatives of the Customer in order to optimize design solutions. Interaction with representatives of suppliers in order to reduce the delivery time of equipment and materials.
Control of the timing of the transfer of subobjects for the production of subsequent types of work. Control over the timely provision, check for completeness and correctness of the as-built documentation. Consideration and approval of acts in the form of KS-6a, KS-2, KS-3. Monitoring compliance with labor protection and safety regulations.
August 2019 — April 2020
9 months
Promstroy
Voronezh
Construction, Real Estate, Architecture... Show more
Engineer on construction management
Managing the complex of electrical installation works at the facility " Increasing the production capacity of thermoplastics from 50 to 100 thousand tons per year at JSC Voronezhsintezkauchuk by project sections: EO, EM, ES, AK, ATX, SMIS, PS, SS.
Operational control of production processes when performing construction, installation and electrical work. Participation in drawing up production schedules for EMR and PNR. Monitoring compliance with EMR and NDP production schedules. Participation in the inspection control of EMR production.
Interaction with representatives of subcontractors necessary for timely and high-quality completion of work. Management of personnel of subcontractors during EMR and NDT, with a total number of up to 210 people.
Interaction with Customer representatives in order to optimize design solutions. Interaction with representatives of suppliers in order to reduce the delivery time of equipment and materials.
Monitoring the timing of the transfer of sub-objects for the production of subsequent types of work. Control over the timely provision of Executive documentation. Review and approval of acts of completed works. Monitoring compliance with health and safety regulations.
February 2019 — August 2019
7 months
Voronezh Engineering company
Voronezh
Construction, Real Estate, Architecture... Show more
Head of the Department
Management of EMR on fixed objects. Operational control of production processes when performing EMR. Interaction with contractors for the purpose of timely and high-quality completion of work. Interaction with the Customer in order to optimize design solutions. Start-up and adjustment works on the entrusted objects. Participation in the preparation and monitoring of work schedules. Control over the timely provision of Executive documentation. Control over observance of rules of health and safety.
December 2016 — December 2018
2 years 1 month
The SIBUR's Zapsibneftekhim
Tobolsk
Construction, Real Estate, Architecture... Show more
Leading engineer for construction organization
Managing complex electrical works during the construction on objects Zapsibneftekhim project EE, EM, AK, ATX, SS, PS. Control and direct participation in the solution of technical tasks during EMR installation and commissioning of substations 630 kVA, 400 kVA, installation of underground cable lines, reconstruction of PL-10 kV and 0.4 kV overhead lines. Operational control of production processes when performing electrical installation and construction works. Direct participation in the conduct of commissioning works. Implementation of interaction with representatives of contractors required for the timely execution of works and enforcement of contractual obligations. Management of personnel of subcontractors during EMR and NDT, with a total number of up to 230 people. Drafting and monitoring compliance with work schedules by contractors, deadlines for transferring sub-objects for subsequent work, and supplies of materials and equipment. Development of corrective measures in the event of delays in the production schedule. Review and approval of acts of completed works. Control over the timely provision of Executive documentation for completed works. Control over observance of rules of health and safety.
August 2016 — October 2016
3 months
Electricians Terbuny
Lipetsk Oblast
Construction, Real Estate, Architecture... Show more
Engineer
Conducting electronic installation work on objects: multi-storey buildings, offices, purchasing materials, preparing documentation for the delivery of the object, negotiating with the Customer and Supervisory authorities.
May 2015 — August 2015
4 months
SRSU-7
Voronezh Oblast
Construction, Real Estate, Architecture... Show more
Acting head of the electrical installation section
Preparation and conduct of electrical installation works (interaction with the customer, with teams) at the following facilities: Voronezh Tire Plant, Kindergarten, located on Rostovskaya street, workshops of the Sintezkauchuk plant. Installation of Instrumentation and control equipment, commissioning of instrumentation and Control equipment in the workshops of the Voronezh Sintezkauchuk plant.
May 2010 — May 2015
5 years 1 month
wage work
Voronezh
Construction, Real Estate, Architecture... Show more
Engineer
Management of a team of builders, finishers, electricians. Approval of project and estimate documentation with the Customer, approval of deviations from the POI. Preparation of work schedules. Supervision of the quality of work and compliance with work schedules. Working with regulatory organizations. Working with contractors.
August 2007 — August 2009
2 years 1 month
Roselektrostroy
Construction, Real Estate, Architecture... Show more
head of electrical installation Department
Negotiating with representatives of the General contractor, representatives of contractors, and representatives of Supervisory organizations. Preparation of technical documentation for the maintenance of objects and Executive documentation. Supervision of contractors performing electrical installation work.
Under my direct supervision, electrical work was performed at the following facilities: "POS.32 Novovoronezh nuclear power plant-2"; swimming pool located in the Khokholsky river; offices and shops. Preparation of work schedules.Preparation of requests for the purchase of tools and materials.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
Skills and abilities:
Experience working with EP contractors.
Experience in installation of electrical equipment, installation of external and internal cable lines, installation of electrical lighting systems, installation and testing of power equipment, installation of video surveillance and communication systems, access control and fire alarm systems, integrated automation systems, construction and commissioning of technological electrical installations.
Responsible approach to work.
Basic knowledge of construction organization processes.
Willingness to work under continuous multi-tasking.
Knowledge of electrical installation work technology and regulations, SNiP and PUE.
Proficient PC user: Microsoft Office (Excel, Word), knowledge of AutoCAD, CAD Compass.
Higher education
2004
Voronezh state agrarian University named after Emperor Peter I
Agricultural engineering, diploma of electrical engineer
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter